Creation of gas wells, Lüdenscheid DE


Location
Lüdenscheid, Deutschland
Execution period
22.10.2024 - 28.10.2024
Client
Abfallentsorgungsgesellschaft des Märkischen Kreises GmbH
Drillings
14 pcs | ⌀ 200 mm und 150 mm
Depth
up to 42 m
Subsoil
Municipal and commercial waste
Expansion
Gas well ⌀ 4"
Particular challenges
Weathering the drilling sites with a blower, working in a suit with a ventilated helmet, operating a black and white system

A feasibility study was conducted for the decommissioned central landfill in Lüdenscheid-Kleinleifringhausen to assess its potential greenhouse gas emissions. These gas emissions represent a possible hazard and can also act as potent greenhouse gases. As part of the optimization measures for gas collection, Urs and Marek installed 13 new gas wells to capture the expected long-lasting gas emissions as effectively as possible. Esther was responsible for occupational safety and created the shift schedules.

Outcome: 228 meters drilled in 8 days, including 2 days mobilization